Training session conducted at Kansas Gas & Electric Company shows boom-and-cradle method. 15 minutes.
Discusses benefits of polymer-housed distribution arresters (PDV) by describing design and manufacturing. 15 minutes.
Ideal training video for showing new personnel how Pole Line Hardware items are used on distribution systems. Shows a number of overhead configurations and how to use hardware. 20 minutes.
Shows use and capabilities of Chance cutouts. 6 minutes.
The first section of this videotape deals with the care and maintenance of tools and protective equipment in the field. The second part covers the care and repair of tools and protective equipment carried out by the lineman at the warehouse-shop. 35 minutes.
Video showing proper operation of hydraulic and electric units. 8 minutes.
Shows how to properly install Chance Super Top-Ties® Line Ties. 9 minutes.
This video covers the conversion of Type D5 and D7 overhead distribution switches from rotating controls to reciprocating pump handle controls. Approximately 5 minutes.
This training program illustrates the installation of a disconnect switch into each phase conductor. Rubber gloves are used while working from an insulated platform. 36 minutes.
Shows in detail the convenient , one-lift field installation procedures of installing the Chance D7 unitized, pre-assembled overhead distribution switch. The configuration illustrated is a horizontal upright unit applicable for voltages of 15, 27 and 34.5 kV. (Approx. running time 24 minutes).